A commercial CoC cannot be responsibly priced as though every shop, office, warehouse or common-property installation has the same scope. Wesslink's specialised-location attendance starts from R1,755; inspection and testing time, certification scope and remedial work are then itemised. Three-phase supplies, multiple boards, tenant alterations, shutdown windows and incomplete records can materially change the final quote.
Indicative priceFrom R1,755Initial specialised-location attendance; testing is scoped
Initial attendanceFrom R1,755
TestingScope based
RepairsSeparate approval
i
This is planning guidance. The final amount depends on the written scope, access, condition, materials, timing and work found necessary. Never treat a search-result price as a property-specific quotation.
Typically included
What the starting scope covers
Initial commercial-site attendance and scope confirmation
Identification of boards, supplies and tenancy or common-property boundaries
Written inspection and testing scope before extended work
Certificate issue only for work that has been inspected, tested and found compliant
Usually separate
What to budget for separately
Extended inspection and testing beyond initial attendance
Remedial work, materials, access equipment and shutdown coordination
Fire, gas, electric-fence, solar or machinery certificates outside the electrical scope
Certification of inaccessible, undisclosed or third-party installations
Why prices move
Four factors that change the final quote
A better quote explains the variables instead of hiding them inside one number.
Installation size
Boards, circuits, floors, units and supply points determine inspection and testing time.
Operational access
Trading hours, permits, escorts and shutdown windows affect how the work can be completed.
Alteration history
Tenant fit-outs and undocumented changes can require circuit tracing and boundary clarification.
Supply type
Three-phase, generator, inverter and metering arrangements add testing and documentation requirements.
Before you approve
Ask for a quote you can actually compare.
01
Scope — the exact installation, points, circuits or areas covered.
02
Price components — attendance, labour, materials, testing and certification.
03
Exclusions — access, finishes, after-hours work and third-party repairs.
04
Approval rule — when additional work must be authorised.
Questions people ask
Commercial electrical CoC FAQs
Is R1,755 the full commercial CoC price?+
No. It is the initial specialised-location attendance basis. The inspection, testing, repairs and certification scope is confirmed for the specific premises.
Can one certificate cover an entire shopping centre?+
Only where the inspected installation and legal scope support that boundary. Tenant and common-property installations may require separate documentation.
Can the certificate be issued before defects are repaired?+
No. The inspected scope must comply before a certificate is issued.
Who should approve remedial work?+
The authorised owner, landlord, tenant or managing party should approve a written scope after responsibilities are clarified.
What should a facilities team prepare?+
Provide board schedules, prior certificates, single-line information, tenant boundaries, access rules and permitted shutdown times.
Rate basis: Wesslink pricing register reviewed 28 July 2026; planning guidance reviewed 27 August 2026. VAT treatment, validity period and exact inclusions must be confirmed on the written quotation.