Assess the site
Record usable area, roof or ground conditions, shade, orientation constraints, access, exposure and ownership boundaries.

PV array · mounting · DC and AC integration
Solar-PV array assessment, installation and electrical integration for Centurion properties, subject to site, roof, loads, equipment, authority, distributor and current availability.
Centurion properties may have Tshwane, Eskom or another verified supply context. A published process for one supplier is not a blanket rule for every address.

Distinct installation owner
This service starts with verified site and electrical inputs, then defines the module array, mounting responsibility, DC wiring and protection, inverter interface, AC distribution connection, testing and appropriate handover for the agreed scope.
Record usable area, roof or ground conditions, shade, orientation constraints, access, exposure and ownership boundaries.
Use actual loads, objectives, supply, equipment data, manufacturer limits and planned future changes.
Coordinate mounting, array cabling, DC protection and isolation, inverter inputs, earthing, labelling and the AC interface.
Test the agreed installation and separate electrical records from warranties, property approvals and distributor outcomes.
No universal shortcut
There is no universal panel count, string layout, inverter ratio or roof-fixing method. Compatibility and configuration depend on the verified property, equipment, manufacturer data and applicable requirements.
Site inputs, modules and mounting, array wiring, DC protection, inverter and distribution interfaces, earthing, labelling, testing, commissioning and handover.
Structural suitability, roof condition, waterproofing responsibility and safe access must be assessed and assigned. Roofing work, structural engineering, warranties, utility approval and feed-in outcomes are not implied.
Centurion project context
Homes, estates and businesses can have different roof controls, loads and distribution arrangements. Establish the real electricity account, property authority and existing system before selecting work.
Verify the electricity account and connection rather than assigning a distributor from the suburb name.
Record roof construction, condition, shade, usable area and any estate or specialist access requirements.
Define consumption, essential loads, grid interaction and planned future changes without promising output.
Keep property approval, distributor steps, electrical testing and final records as distinct responsibilities.
Connected owners
Use solar electrical services for broader diagnosis, compliance-interface and remedial work. Use this owner for a defined new or expanded PV array. Inverter, battery and essential-load integration remains separate where that is the main appointment.
Prepare a useful brief
Send the exact address and distributor, property authority, roof type and condition, usable area, shade and access, electricity-use profile, intended outcome, existing equipment, verified supply information, grid/export intention, drawings, bills, product data, future loads and current registration status.
Questions before design
Testing can confirm the installation; it cannot pre-guarantee output, yield, savings, payback, backup duration, approval, tariff credit or a compliance outcome.
No. This owner covers the complete new or expanded PV-array task and its verified electrical integration. Inverter, battery and essential-load integration can be a separate appointment.
Roof type, condition, pitch, usable area, shade, access, waterproofing responsibility, environmental exposure and any need for structural or access specialists must be identified.
Potentially, after the existing modules, strings, inverter inputs, protection, cabling, mounting, warranties, records and compatibility are verified.
They depend on the verified site, roof, shade, load objectives, equipment data, manufacturer limits and applicable requirements. There is no universal panel count, string layout, inverter ratio or roof-fixing method.
The actual distributor and system configuration must be confirmed. Grid-parallel, non-export, export and off-grid arrangements can have different requirements.
The owner, landlord, body corporate, estate or facilities manager may control roof rights, common areas, access and shutdowns. These remain separate from electrical testing and distributor processes.
Not necessarily. The first visit may identify design inputs, access or structural needs, compatibility issues, distributor steps or remedial work. Testing determines the handover records and whether certification is possible.
Defined scope, honest quote