BUSINESS PREMISES · NEW BOUNDARIES · MOVE-IN PREPARATION

Need an Electric Fence COC in Lanseria?

Moving into or extending business premises in Lanseria? Check what the fence project includes before occupation or final building work. Wesslink can assess an existing installation for an electric fence COC, explain repairs and quote for proposed changes. Provide the property’s actual layout and contact rather than relying on directions to the airport alone.

Arrange access through the responsible property or estate contact. Airport access procedures should only be used for an appointment actually involving airport-controlled premises.

Electric fence wires and insulators mounted above a boundary wall, with a yellow warning sign
ELECTRIC FENCE COMPLIANCEInspection first. Certification when the system complies.

BEFORE YOU BOOK

Identify the business property and its finished boundary.

Lanseria Corporate Estate offers industrial stands near Lanseria International Airport, while other properties use Lanseria addresses independently. For a business move or extension, give the stand or building, street and attendance entrance. The fence requirements depend on the actual premises and planned use, so distinguish existing equipment from the boundary work still to be constructed.

01

A new stand needs a perimeter proposal

Describe the proposed wall or supporting barrier, vehicle entrances and areas that will be used first. Arrange site assessment before ordering an electric fence installation from an approximate perimeter length. The quotation needs a defined finished arrangement and the relevant owner or estate approval, including any work that depends on another contractor completing a structure.

02

A building extension changes the outside area

Identify equipment and access routes affected by the extension. If a fence section must be moved or temporarily changed, have the appropriate contractors coordinate that work before construction reaches it. Keep the retained and new installation clearly described so later inspection can follow what actually changed around the extended premises.

03

A tenant takes over an existing building

Request the fence certificate and maintenance history with the property handover records. Ask which equipment belongs to the property and whether anything will be removed by the outgoing occupier. Electric fence repairs should address assessed findings, with landlord or estate approval obtained where required before a tenant commissions changes.

Allow time between the first inspection and the final handover.

For an electric fence compliance certificate, provide records for the installation actually present and explain planned alterations. If walls, gates or supply arrangements are unfinished, identify those dependencies when booking. The inspector can explain the assessment needed at the relevant stage; an occupation date does not establish that every part of the fence will be ready or free of defects.

Where a reported fault remains from the previous occupancy, retain the earlier findings and describe the current symptom. Electric fence fault finding should not start from an assumption that old equipment must all be replaced. Agree how corrections will be approved and recorded, and give the final installation information to the person responsible for ongoing property maintenance.

INSPECTION & TESTING

What does an electric fence COC inspection cover?

A working energiser is one part of the system. The inspection also considers the fence installation, its safety provisions and the test results.

An electric fence certificate follows inspection and testing by a registered person. Defects affecting compliance must be corrected before certification. Read Regulations 12–13 ↗

Insulated test equipment beside electric fence wires and wall-mounted insulators
  1. 01

    The energiser and fence circuit

    Identify the equipment and the fence sections it supplies, including alterations and gate crossings.

  2. 02

    Earthing and physical condition

    Inspect the earth system, wires, joints, brackets and insulators, together with the installation’s condition.

  3. 03

    Warning signs and accessible areas

    Check the safety provisions around the fence, including signs and places where people can approach it.

  4. 04

    Testing, corrections and certification

    Explain defects found, agree the repair work and complete the checks needed before certification.

ELECTRIC FENCE COC COSTS

Get a quote for the fence you actually have.

A clear quote identifies inspection, repairs to retained equipment and new work for the changed premises. Include the building schedule, approved layout and access restrictions. Ask which structural, supply or making-good work needs separate pricing, so the business move does not leave unresolved responsibilities between the fence, building and property teams.

Request a quote for Lanseria ↗
Close-up of a cracked black electric-fence insulator supporting a single wire
Inspection helps identify damaged components before repairs are quoted.

Ask for these costs separately

Inspection and testing
The agreed visit and assessment of the identified installation.
Repairs, if required
The defects found, the proposed work and parts before you approve repairs.
Return visit and certification
Whether retesting or a further visit is included in the quotation.

No fixed price is assumed before the installation and access requirements are understood.

LET’S ARRANGE THE RIGHT VISIT

Need help with your fence certificate?

Call Wesslink Electrical or prepare a short WhatsApp enquiry.

072 271 7111 ↗
Homeowner discussing an electric-fence inspection with a technician beside a driveway gate

Have these details ready

  • The Lanseria street address, stand or building and suitable arrival entrance.
  • The existing and proposed boundary layout, including vehicle access.
  • Previous certificates and repair records for any retained fence equipment.
  • Owner or estate approval and the contact coordinating building and fence work.

Review the message before opening WhatsApp. This does not confirm an appointment.

ELECTRIC FENCE COC · LANSERIA

Questions before you book.

Practical answers for owners, sellers and property managers.

When should I arrange the electric fence certificate of compliance assessment before a move?

Raise it early enough to identify defects and dependencies on building work. Provide the move date and current installation status so inspection and any required follow-up can be planned realistically.

Is your electric fence alarming after an extension project?

Record the time and message and describe the work completed. Keep clear of equipment and arrange assessment; the project timing does not by itself prove which component caused the fault.

Can you price a new fence from the stand size?

The stand size alone does not define the proposed installation. Provide the layout and arrange assessment of the actual supporting barrier, entrances and other relevant conditions.

Who should approve work in a business estate?

Confirm the instruction with the property owner and relevant estate management. Obtain the applicable approval and access arrangements before installation or alteration work is commissioned.

Who can issue an electric fence certificate of compliance?

A registered electric fence system installer may issue an electric fence compliance certificate after the required inspection and testing. An ordinary electrical COC is a separate document.

Will the inspection fee include repairs?

Ask for the inspection, any repairs and any return visit to be itemised in the quote. The work required depends on what is found; a price should not assume that the fence will pass before it has been inspected.