An electrical Certificate of Compliance is issued only after the installation has been inspected, tested and found compliant. For a straightforward residential inspection and certification, a practical planning range is R900 to R1,900. That is not a promise that every property will fall inside the range: remedial work, access, installation size and missing circuit information can change the final amount.
Indicative priceR900 – R1,900Typical inspection and certification range
Planning rangeR900–R1,900
RepairsUsually separate
Best first stepInspection scope
i
This is planning guidance. The final amount depends on the written scope, access, condition, materials, timing and work found necessary. Never treat a search-result price as a property-specific quotation.
Typically included
What the starting scope covers
Visual inspection of accessible electrical installation components
Required electrical testing for the installation being certified
Recording of defects or non-compliant items found during inspection
Certificate issue only after the inspected installation complies
Usually separate
What to budget for separately
Repairs, replacement parts and remedial labour
Opening ceilings, walls or inaccessible finishes
Separate electric-fence, gas or solar documentation
Work outside the installation and scope agreed for inspection
Why prices move
Four factors that change the final quote
A better quote explains the variables instead of hiding them inside one number.
Property and installation size
More circuits, DB boards, outbuildings or supplies require more inspection and testing time.
Access
Locked rooms, occupied tenancies, high ceilings and inaccessible points can extend the visit.
Condition
Older alterations, missing covers, damaged equipment or undocumented work may create a repair list.
Scope
A sale, tenant alteration, shop fit-out or supplementary CoC may require a different inspection boundary.
Before you approve
Ask for a quote you can actually compare.
01
Scope — the exact installation, points, circuits or areas covered.
02
Price components — attendance, labour, materials, testing and certification.
03
Exclusions — access, finishes, after-hours work and third-party repairs.
04
Approval rule — when additional work must be authorised.
Questions people ask
Electrical CoC FAQs
Does the quoted amount include repairs?+
Usually not. Ask for the inspection and certification price to be separated from any remedial work so that the scope stays clear.
Can a certificate be issued on the first visit?+
Yes, when the installation is accessible, the scope is clear and the inspected work is compliant. If defects are found, they must be corrected before certification.
Is an electrical CoC the same as an electric-fence CoC?+
No. They are separate compliance processes and should be quoted and documented separately.
How long is an electrical CoC valid?+
A certificate relates to the installation and scope at the time it was issued. Later additions or alterations require appropriate supplementary certification.
What should I send when requesting a quote?+
Send the suburb, property type, approximate size, reason for the certificate, number of DB boards and any access constraints.
How do I get an electrical compliance certificate?+
Book an inspection for the installation that needs certification and provide the property and access details. The electrician inspects and tests the agreed scope. If defects are found, any remedial work must be quoted and authorised separately, then completed and retested. A certificate can be issued only after the relevant installation is compliant.
How long does it take to get an electrical compliance certificate?+
Timing depends on the property and inspection scope, access, the installation's condition, any defects found, repair authorisation, retesting and completion of the required documentation. A fixed or same-day turnaround should not be assumed.
Rate basis: Wesslink pricing register reviewed 28 July 2026; planning guidance reviewed 26 August 2026. VAT treatment, validity period and exact inclusions must be confirmed on the written quotation.