Gauteng cost guide · Updated 27 August 2026

Generator changeover-switch installation cost

A basic single-phase manual changeover-switch installation starts from about R3,200 where the board is accessible, the selected switch suits the supply and only a short standard connection scope is required. The generator, inlet arrangement, extended cabling, enclosure changes and corrective work are separate. The design must prevent unsafe back-feed and account for the neutral and earthing arrangement.

Generator changeover-switch installation planning for a Gauteng property
Price guide image: Wesslink Electrical
Indicative priceFrom R3,200Basic single-phase starting scope; generator excluded
Starting scopeFrom R3,200
GeneratorNot included
Three-phaseSite quotation

This is planning guidance. The final amount depends on the written scope, access, condition, materials, timing and work found necessary. Never treat a search-result price as a property-specific quotation.

Typically included

What the starting scope covers

  • Assessment of the supply, DB-board position and proposed generator connection
  • Entry-level single-phase manual changeover device within the stated basis
  • Standard installation labour for a short accessible scope
  • Operational testing and safe changeover explanation

Usually separate

What to budget for separately

  • Generator, automatic transfer equipment and load-management controls
  • Long cable routes, generator inlet boxes and civil or weatherproofing work
  • Three-phase equipment, DB-board rebuilding and earthing corrections
  • Fuel systems, exhaust, acoustic work and generator servicing

Why prices move

Four factors that change the final quote

A better quote explains the variables instead of hiding them inside one number.

Manual or automatic

Automatic transfer and control equipment is substantially different from a manual changeover.

Supply phase

Three-phase supplies need correctly rated multi-pole equipment and a different design scope.

Cable route

Distance, cable size, containment, weather exposure and inlet position affect materials and labour.

Essential loads

Separating priority circuits can require a sub-board or DB-board reconfiguration.

Before you approve

Ask for a quote you can actually compare.

  1. 01

    Scope — the exact installation, points, circuits or areas covered.

  2. 02

    Price components — attendance, labour, materials, testing and certification.

  3. 03

    Exclusions — access, finishes, after-hours work and third-party repairs.

  4. 04

    Approval rule — when additional work must be authorised.

Questions people ask

Generator changeover switch FAQs

Why is a changeover switch necessary?+

It separates utility and generator sources so the installation cannot feed electricity back into the network or connect sources incorrectly.

Is the generator included in the price?+

No. The starting figure covers a basic changeover installation basis only; the generator and its accessories are separate.

Can I plug a generator into a wall socket?+

No. Improvised back-feeding is dangerous and can expose occupants and utility workers to live conductors.

Will every circuit run on the generator?+

Only if the generator, wiring and design support the load. Many properties use a selected essential-load arrangement.

Does the alteration need certification?+

Electrical additions or alterations must be inspected, tested and appropriately certified for their scope.

Make the scope clearer

Send the property details before you book.

Include the suburb, property type, reason for the work, access constraints and safe photos where relevant.

Request assistance WhatsApp Wesslink

Rate basis: Wesslink pricing register reviewed 28 July 2026; planning guidance reviewed 27 August 2026. VAT treatment, validity period and exact inclusions must be confirmed on the written quotation.