Gauteng cost guide · Updated 27 August 2026

Supplementary electrical CoC cost

A supplementary CoC for a clearly defined, accessible and compliant addition or alteration typically uses the R900 to R1,900 inspection-and-certification planning range. The Electrical Installation Regulations require a CoC for at least an addition or alteration made to an installation that already had a certificate. The document must identify its real scope; it does not silently re-certify unrelated pre-existing work.

Supplementary electrical CoC review for tenant alterations in Gauteng
Price guide image: Wesslink Electrical
Indicative priceR900 – R1,900Typical limited-scope inspection and certification range
Planning rangeR900–R1,900
CoversDefined alteration
RepairsUsually separate

This is planning guidance. The final amount depends on the written scope, access, condition, materials, timing and work found necessary. Never treat a search-result price as a property-specific quotation.

Typically included

What the starting scope covers

  • Confirmation of the addition or alteration being presented for certification
  • Inspection and testing of the defined accessible work
  • Defect record where the presented work does not comply
  • Certificate issue only after the inspected scope complies

Usually separate

What to budget for separately

  • Automatic certification of the whole pre-existing installation
  • Repairs, reconstruction and undocumented work outside the agreed scope
  • Opening finishes or tracing concealed work without an approved scope
  • Separate solar, gas, fence or specialist documentation

Why prices move

Four factors that change the final quote

A better quote explains the variables instead of hiding them inside one number.

Scope clarity

A labelled circuit and defined alteration are faster to verify than undocumented mixed work.

Access

Closed ceilings, fixed cabinetry and trading premises can extend inspection time.

Quality of work

Missing identification, incorrect protection or poor terminations require correction before certification.

Existing installation

The new work must connect safely to the installation; upstream defects can affect the certification boundary.

Before you approve

Ask for a quote you can actually compare.

  1. 01

    Scope — the exact installation, points, circuits or areas covered.

  2. 02

    Price components — attendance, labour, materials, testing and certification.

  3. 03

    Exclusions — access, finishes, after-hours work and third-party repairs.

  4. 04

    Approval rule — when additional work must be authorised.

Questions people ask

Supplementary electrical CoC FAQs

What is a supplementary electrical CoC?+

It documents an inspected and compliant addition or alteration to an installation that already has prior certification.

Does it replace the original certificate?+

It normally sits with the earlier certificate and test report so the documents together describe the installation history.

Can a tenant obtain one for a shop fit-out?+

Yes, where the electrical work and authority to inspect are clear. Landlord and lease requirements should also be checked.

Are repairs included in the range?+

Usually not. The range is for inspection, testing and certification of a suitable limited scope; defects are quoted separately.

What does the law say about alterations?+

Regulation 7(4) of the Electrical Installation Regulations requires a CoC for at least the addition or alteration where a certificate was previously issued.

Make the scope clearer

Send the property details before you book.

Include the suburb, property type, reason for the work, access constraints and safe photos where relevant.

Request assistance WhatsApp Wesslink

Rate basis: Wesslink pricing register reviewed 28 July 2026; planning guidance reviewed 27 August 2026. VAT treatment, validity period and exact inclusions must be confirmed on the written quotation.